Project
Development of solutions for auxiliary equipment (stabilization piles, handling winches, deck cranes).
Solution
Project | Instalation | Assistance
Green Kinetics developed the entire hydraulic and electrical design for mast, bridge and solar deck cranes, design and production of power packs and cylinders.